Newley Opened SW8 Third Space Gym, the trendiest place to be!
28,000sqft of training space, under curved brickwork, recalling the original Power Station, this fantastic club has its own dedicated HIIT Studio, Elieko weightlifting area along with its custom built Rig.
CD International has provided a concept and detailed design for building services and contractor's coordination on site, followed by an Energy Performance Certificate.
The total area for this gym is 2622m2 Distributed over the Ground floor and Lower Ground Floor.
Client: Third Space
Architect: Quadrant Design
Interior: Studio RHE
M&E Design: CD International BSE
Project and Cost Management: MESH Construction ConsultancyÂ
Design: Woodford Interiors
Lighting: OptelmaÂ
Electrical Contractor: Lumens
Mechanical Contractor: Churchill & Blakedown Mechanical Services
Acoustic specialist: Red AcousticÂ